All Projects | Tr House
Published: 01 August 2019
Description
Family members were growing and need of additional space in this developer house. The existing house which only contained 2 bedrooms with a total area of only 100 sqm was felt by the owner. We were given the task to renovate this house by adding 2 additional bedrooms along with the bathroom and wash area with minimal budget. We leave the ground floor layout to minimize the budget, additional bedrooms are placed right above the existing bedrooms. Spiral stairs made of steel are chosen in addition to economical reasons and space saving. The roof of the building uses zincalum material with a steel frame made high to create a void, bringinng in light and view into the room at the same time.
Family members were growing and need of additional space in this developer house. The existing house which only contained 2 bedrooms with a total area of only 100 sqm was felt by the owner. We were given the task to renovate this house by adding 2 additional bedrooms along with the bathroom and wash area with minimal budget. We leave the ground floor layout to minimize the budget, additional bedrooms are placed right above ...
Show lessShow moreProject Status: Terbangun
Project Year: 2018
Project Cost(IDR): IDR 251 juta - 500 juta
Lokasi: Bandung, Kota Bandung, Jawa Barat, Indonesia